Christchurch · Jolt
Central Park - Little High
A 25 kw dc fast charging site in Christchurch.
Getting there
Christchurch · -43.53628, 172.64104
Saved on this device only — see your saved chargers. To bookmark the page in your browser, press Ctrl+D.
Source · OpenStreetMap contributors (ODbL) · Central Park - Little High · Data 2026-08-07 · Reviewed Aug 2026 · Method
This is not a live map
ChargeMap describes what is installed at each site — power, connectors, operator — from OpenStreetMap. It does not know whether a plug is free, working, or even still there right now, and no static page can. Before you rely on a charger, check the operator's own app. Treat everything here as a starting point, not a guarantee.
How long a charge takes here
Estimated 10–80% charging time at this site's 25 kW rating, for three battery sizes. DC charging slows sharply above 80%, which is why the industry quotes 10–80% and so does this.
| Battery | 10–80% | Energy added |
|---|---|---|
| 40 kWh | 1 h 30 m | 28 kWh |
| 60 kWh | 2 h 14 m | 42 kWh |
| 80 kWh | 2 h 59 m | 56 kWh |
Estimates, not measurements. Real speed depends on the car, the battery temperature, the state of charge you arrive at, and how many other cars are sharing the site. How this is worked out.
What that costs
A 60 kWh battery from 10% to 80% takes about 42 kWh. At three illustrative rates:
| Scenario | Rate | Cost of that charge |
|---|---|---|
| Charging at home | $0.29/kWh | $12.18 |
| Public AC | $0.45/kWh | $18.90 |
| Public DC fast | $0.80/kWh | $33.60 |
Illustrative rates, not this operator's prices — public charging tariffs vary by network, plan and time of day. Substitute the rate you actually pay. More on charging costs.